Location: | Sitio Lawi, Barangay Concepcion, Busuanga, Palawan Busuanga, Philippines |
Building Area: | 14 buildings, total with about 1000㎡ |
Year of building: | 2019 |
Design of materials and load standard value: | LGS TRUSS frame, use G550, AZ150g/㎡ materials, the lift span can be 50 year as Permanent buildings |
Project Description | Single floors light structure steel as residential building |











