Location: | Sitio Lawi, Barangay Concepcion, Busuanga, Palawan Busuanga, Philippines |
Building Area: | 280 ㎡ |
Year of building: | 2017 |
Design of materials and load standard value: | LGS TRUSS frame, use G550, AZ150g/㎡ materials, the lift span can be 50 year as Permanent buildings |
Project Description | Two floors living house, basement used as a small workshop for Damien to repair the Speedboat. This house is inside the BBL resort. |








