Hangzhou Lutuo Architectural Engineering Co.,Ltd

enLanguage
Prefabricated Modular Worker Accommodation Building
video
Prefabricated Modular Worker Accommodation Building

Prefabricated Modular Worker Accommodation Building

Prefabricated modular worker accommodation building is a new concept of environmental protection and economic movable board house with light steel as the framework

Product Introduction

Prefabricated Modular Worker Accommodation Building


image001


We has extends business to over thirty countries in Southeast Asia, Africa and South America, such as Philippines, Laos, Thailand, French reunion, Panama, Venezuela, British Virgin islands, Tonga, PNG, Vanuatu, New Zealand and Australia, etc. LUTUO is deeply accepted and trusted by clients. We will work hard and strive towards our service concept of "Zero-Defect Quality, Zero-Distance Service and Zero-Complaint Service".


Prefabricated modular worker accommodation building is a new concept of environmental protection and economic movable board house with light steel as the framework, sandwich board as the enclosure material, space combination with standard module series, members connected by bolts.


It can be easily and quickly assembled and disassembled to realize the general standardization of temporary buildings, establish the construction concept of fast and efficient, and make temporary houses into a series of development, integrated production and matching supply.


Different Design


image003


Product Description


Product Name

Modular Container House

Style

Flat Pack

Brand

ZhuAi

Colour

Customized

Insulation Type

Rockwool/PU sandwich panel

Place of Product

Shanghai, China

Size

6058*2438*2896mm

Shipment

4 units / 20' SOC

After sale service

After sale service




1


Productive Process


Step1: Steel frame welding,Step 2: fixed floor deck and vinyl sheet, and pre-embedded the polish, rust cleaning, painted pluming in the chassis
image0871


Step 3: fixe windows/doors in the sandwich wall panelStep 4: install the wire and pipe in the roof and the sandwich wall panel
23


Packing and Loading


2


Installation Steps


3


Project Case


Camp Office project in Philippines

This project is built at Jan, 2014, Loacated in Philippines, it is consist with 34pcs of 20ft container house, it can be for 200 staff for working. The main function for this project is used as the office building for a big camp company in Philippines.


image133

1


Ghana Accommodation project

This project is built at June, 2015, Loacated in Ghana, each building is consist with 20pcs of 20ft container house, single floor structure. The main function for this project is used as the Accommodation building for some low incomings in Ghana.


1

2


Office project in UK:

6

7


Mining camp project in Aktogai, Kazakhstan:

● Project time: 2015.4 -2015.12

● Location: Aktogai, Kazakhstan

● Category: Mining camp housing project

● Product: Container house


All of the container houses are designed one-storey structure, featured in heat preservation and insulation, and the dimension of most units is 2880CM * 9144CM * 2991CM. The whole project is consist of 1550 container house in which it forms dormitories of workers and managers, recreation centre, living facilities include dining hall, washhouse, emergency room, supporting facilities include waiting room, prayer room, logistical and security center.


image167

8


FAQ


Q1. Are you a factory or a trading company?

We are professional factory with ISO, CE standard, OEM service is welcome.


Q2. What's your delivery time?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 23-15 days after receive deposit. Large order delivery time should be arranged separately.


Q3. How to control the quality of your product?

a) Quality of the design: think about possible problems in advance and provide a high quality design solution.

b) Quality of the raw material: choose the qualified raw material

c) Quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.


Q4. How long time your paint will last?

The durable time will be different in different zinc, paint coating. Also different environment has different effect on the durable time.


Hot Tags: prefabricated modular worker accommodation building, China prefabricated modular worker accommodation building manufacturers, suppliers, factory, modular flat pack container house, flat pack container house for temporary dormitory, temporary shipping container homes, Modular Worker Accommodation, mobile modular office container, flat pack container homes

You Might Also Like

(0/10)

clearall