How to set up scaffolding

1. The requirements for supporting rods cantilever scaffolding requirements

The supporting rod cloak scaffolding needs to be controlled by the load, and the setting should be firm. When setting up, set up a milestone to make the crossbars extended out of the wall, and then support the diagonal rod to connect with the horizontal rod to be firmly connected. Then there is a cantilee part, pave the footboard, and the periphery should be set up by railings and stepping boards. The following safety net is equipped to keep safety.

2. Settings of wall parts

According to the axis size of the building, one is set every 3 spans (6m) in the horizontal direction. In the vertical direction, one should be set every 3 to 4 meters, and each point is required to be staggered to form a plum -like layout.

3. Vertical control

When setting, the verticality of the segmented scaffold should be strictly controlled, and the vertical degree allows the deviation:

4. Putting on the panel

The bottom layer of the foot plate should be covered with thick wooden scoop panels, and each layer can be covered with a thin steel plate with a thin steel plate.

5. Safety protection facilities

Each layer of the scaffolding should be set up and the fence and footboard should be set.

The outer and bottom of the scaffolding are closed with densely safe safety nets, and the necessary channels should be maintained by racks and buildings.

The connection between the standing rod of the beam -type scooter and the beam (or longitudinal beam).

Welding 150 ~ 200mm long steel pipes on the pick beam (or vertical beam), and its outer diameter is 1.0 ~ 1.5mm smaller than the inner diameter of the scaffolding rod. Ensure the stability of the shelf.

6. Connection between the suspended beam and the wall structure

The iron parts should be buried in advance or the holes should be kept to ensure that the connection is reliable, and the holes must not be cut casually to destroy the wall.

7. Small bar (rope)

Colders (rope) should be equipped with a tightening device so that the trolley can be carried after tightening.

8. Steel bracket

Steel bracket welding should ensure the height of the weld and the quality meets the requirements.